Had a productive day, finishing all of the control assembly and installations. Fun stuff!First up was assembling and installing the flap handleNext was fitting and installing the mixer assembly. There is some light resistance felt at the mixer assembly but I think it will break in with no problem. Not shown is the flap connect tube and the aileron connect tube.Then on to the elevator idler and connect tubes.This shows the attach point at the elevator. So that is all for the controls for now. Later on everything will be adjusted to spec. Time to change gears and install the floorboards.