Had a productive day, finishing all of the control assembly and installations. Fun stuff!
8D9D156D-C430-429D-A153-0F67F9522A0D
First up was assembling and installing the flap handle
9900551D-B58D-41AB-8D79-B72756419551
Next was fitting and installing the mixer assembly. There is some light resistance felt at the mixer assembly but I think it will break in with no problem. Not shown is the flap connect tube and the aileron connect tube.
C8D15734-F356-49F2-A879-170E3EDDED8E
Then on to the elevator idler and connect tubes.
BAD1B4B2-BC60-4285-8B2D-3EBDA9958AF7
This shows the attach point at the elevator. So that is all for the controls for now. Later on everything will be adjusted to spec. Time to change gears and install the floorboards.